Move the wall between ST office & bathroom #1 inward 1 foot and move the closet wall outward 2 feet and install ‘sound reducing’ materials in each wall
Remove counter tops & cabinets from all bathrooms
Modify bathroom #1 to be ADA accessible. Add grab bars, widen doors, to allow min. 30” access space, move toilet to allow 60” approach
Replace all toilets to ADA compliant
Replace sinks & fixtures in both breakrooms and garbage disposal to each
Install attic access hatch with pull down stair in 2nd floor large room #1
Remove partial wall(s) in lobby area
Install reception counters in ET office & DB office, extending from lobby wall into offices with three-quarter wall with a ‘secure opening’ and secured doors on the end with under counter shelves and cash box drawer
Repair & paint all walls, doors, etc. (including conduits)
Remove all flooring
Install carpet tiles on 1st floor
*Clean & repair 2nd floor carpet
Install LVT in lobby, bathrooms & breakrooms
Clean stairs from 1st to 2nd floor
Clean, paint, repair existing handrail
Install handrail on entire opposite stairway wall
Remove door at top of stairs and install in the middle of first landing